Pictures and small items
An X-shaped picture hook is enough. The nail passes through it at an angle, so it can't break out of the plaster. For heavier items, use a hook with two or three nails.
up to 4 kg per nailInsulating Neopor® formwork blocks slot together and are filled with concrete. The result is a solid wall insulated on both sides – and the shell stands in 8 days on average.
Certified component suitable for passive houses in the two coldest climate zones.
European Technical Assessment of the formwork block system under ETAG 009.
We manufacture every block ourselves, under our own brand and without intermediaries.
Only proven raw material, plus a voluntary quality inspection every year.
The block is both formwork and insulation. It stays in the wall permanently after pouring, so the shell is built and insulated in a single step.
Try building the wall yourself.
The blocks fit together like a construction kit. After a short briefing, even a beginner can do it.
Our architects prepare the drawings and a DIN cost breakdown. The structural engineer provides structural and thermal calculations.
We produce the blocks for your project and deliver them to site just in time, with no storage needed.
The blocks interlock course by course, for walls up to 3 m high. Our construction assistant guides you at the start.
The walls are reinforced and filled with concrete using our loaned pump. The insulation stays in the wall for good.
You get far more than material. A whole team supports you from design to finished shell.
Our architects prepare the drawings and cost breakdown you need for your planning application. The structural engineer handles the shell's structural design and the actual thermal performance certificate.
At the start of every build, our assistant looks over your shoulder until you know exactly what to do. If you don't self-build, the support is even more extensive.
We manufacture all material for your project and deliver it to site exactly when you need it, so nothing gets damaged in storage.
A concrete pump with hose worth over €100,000 is yours to use free of charge for as long as the shell takes. Our assembly props were developed specifically for our blocks.
Experts are on hand by phone and in a dedicated WhatsApp group, with an answer within 24 hours at the latest.
One building system for homes of any shape, from the first course to the roof.
With a thermal conductivity of λ ≈ 0.032 W/mK, Neopor® insulates the wall without extra cladding.
The insulation is continuous throughout the shell, including corners and junctions.
Owners save at least €2,000 a year on energy compared with other building systems.
The material does not absorb moisture and dampens sharp temperature swings in summer and winter.
Fire resistance REI 120 for load-bearing walls. Neopor® granulate contains a flame-retardant additive.
The wall meets sound insulation standards, often outperforming conventional masonry.
No standard house types. The simple modular grid gives you complete freedom of layout.
The shell costs around 30 % less and the house stands 3–6 months sooner on average.
No steel components that could corrode, and resistant to mould, algae and insects.
The material is largely recyclable, and lower energy use reduces the home's carbon footprint.
Anyone looking at kit houses soon comes across aerated concrete. The VHG system works on a fundamentally different principle.
| VHG block | Aerated concrete (e.g. Ytong) | |
|---|---|---|
| Principle | Permanent Neopor® formwork with a concrete core | Aerated concrete block without a concrete core |
| Load-bearing element | Reinforced concrete core | The block itself |
| Thermal conductivity | λ ≈ 0.032 W/mK | λ ≈ 0.08–0.12 W/mK |
| Sound insulation | Higher | Lower |
| Compressive strength | Higher | Lower |
Most prefabricated houses use timber-frame panels assembled on site. They go up quickly, but they are not solid construction. A VHG house is built from concrete on your plot, with better sound insulation, a longer service life, full freedom of layout and stronger long-term value.
Key figures for architects, structural engineers and builders.
| Wall type | Inner shell | Concrete core | Outer shell | Total thickness | Wall weight |
|---|---|---|---|---|---|
| mm | mm | mm | mm | kg/m² | |
| Standard | 50 | 150 | 50 | 250 | 362 |
| Iso block | 50 | 150 | 150 | 350 | 364 |
| Iso block | 50 | 150 | 250 | 450 | 366 |
| Element | Dimensions (L × W × H) |
|---|---|
| E02 · standard block 25 cm | 125 × 25 × 25 cm |
| N21 · standard block 35 cm | 125 × 35 × 25 cm |
| N22 · façade formwork block | 125 × 35 × 25 cm |
| N22 + HCE3 | 125 × 45 × 25 cm |
| N23 · façade lintel block | 125 × 35 × 25 cm |
| N23 + HCE3 | 125 × 45 × 25 cm |
| N31 · passive block 45 cm | 125 × 45 × 25 cm |
| E03 · façade lintel block | 125 × 25 × 25 cm |
| E04 · façade formwork block | 125 × 25 × 25 cm |
| E05 · height adjustment | 125 × 25 × 3.5 cm |
| HCE3 · insulation adapter | 125 × 10 × 25 cm |
| N12 · end element | 16 × 5 × 25 cm |
We also produce U and L blocks, end sliders, firewall blocks and basement blocks with a 20 cm concrete chamber.
Behind the plaster sit 5 cm of Neopor® insulation and then the concrete core. Choose the fixing method by the weight of what you're hanging.
An X-shaped picture hook is enough. The nail passes through it at an angle, so it can't break out of the plaster. For heavier items, use a hook with two or three nails.
up to 4 kg per nailA standard wall plug is anchored into the concrete core. Because it passes through 5 cm of insulation, load it to only about 30 % of its rated capacity.
≈ 30 % of plug capacityCut an opening in the insulation and fit a timber wedge. The screws bear on the wood, so they won't snap. Cover the area with mesh before plastering.
4 × 6 cm timber wedgeUse heavy-duty anchors. For shear loads, set them in assembly cement in the recessed insulation so they can't break.
anchor + assembly cementThe VHG floor slab system: factory-made edge elements, three layers of XPS insulation and pouring without extra formwork. Three people built this passive-house slab in five working days.
Gravel subgrade, drainage pipes in the crushed-stone base and a stainless foundation earth electrode. Made-to-measure elements delivered, first insulation layer and all edge elements with frost apron laid.
Second and third insulation layers laid to plan, 3 × 10 cm in total for a passive house. The 24 cm edge elements fit to the millimetre.
Damp-proof membrane, spacers for the bottom reinforcement and an earthing strip fixed to the mesh to DIN standards.
Top reinforcement including additional bar reinforcement. Structural sign-off by the site manager and approval to pour.
Pump and mixer truck arrive on time. The whole slab is poured without formwork, levelled and power-floated.
Neopor® formwork blocks are also ideal for building swimming pools. The insulation helps keep the water warm and significantly cuts the energy needed for heating.
We have been producing ICF elements since 1990 and also supply complete production systems. Our modern, automated lines make blocks for single-family homes, apartment buildings and commercial projects.
More than 1,100 self-builders have already realised their dream of an affordable home.
If I, as a complete beginner, could build my family home and office building in 3–4 weeks, you can do it too.
Idar-Oberstein
Watch video (German)Geichlingen
Watch video (German)Langendorf
Watch video (German)Time and helping hands. The system only works with your own effort: we show you the way and we're always reachable, but you walk it yourself.
A bricklaying apprenticeship. Just be ready to follow our construction assistant's instructions and you can get started.
Yes. The system is designed so that almost anyone can build with it. Practical skills help but aren't required. All you need are your own two hands and one or two helpers to speed things up.
Depending on which of the three options you choose, the support can be very comprehensive. We'll discuss what fits your plans in a no-obligation conversation.
Our quote is valid for 4 weeks, and we offer a 6-month price guarantee on materials because we produce and transport them ourselves. The planner's cost breakdown serves as the baseline. We recommend tendering all follow-on trades, and we're happy to help.
The more work you do yourself, the more you save. Our customers have typically saved around a third of the construction cost. For a 130 m² family home that means €25,000–50,000, and up to €100,000 depending on the project.
8 days on average for a full self-build with 2–3 helpers. No drying times, no complicated junctions, a clear sequence of work, proven in more than 5,500 projects across Europe.
Yes. Once filled with concrete, the wall is a full reinforced-concrete wall. Structural, acoustic and fire performance meet the requirements for conventional solid construction.
An aerated concrete block carries loads itself, without a concrete core. In the VHG system the concrete core carries the load while the Neopor® remains in the wall as permanent insulation. The result is better sound insulation, higher compressive strength and better thermal insulation.
Neopor® insulation with λ ≈ 0.032 W/mK meets the energy requirements for efficient homes, for example KfW Efficiency House 40 loans in Germany. Check the funding conditions in your country before construction starts.
Yes. Bungalows are particularly well suited to the VHG system: single storey, free layout and step-free from the outset.
No problem. You can build together with the VHG team or have us erect the complete shell for you.
Book a free, no-obligation consultation. Together we'll find out which of the three options suits you best and review your construction budget.
Book a consultation